Another successful project from Adeli Construction, your trusted partner in transformative construction solutions. We are excited to present our finalized project for the comprehensive renovation and modification at SMPK Church and Institution. Working in an occupied building where noise generation should be at a minimum, we successfully achieved to have the project submitted on time as per the project timeline. With a commitment to excellence, quality, and seamless project management, Adeli Construction stands ready to bring a positive and impactful change to SMPK Church and Institution.
- Area: 2200sqft
- Type: Institutional
- Time frame: 2.5 months
- Divisions: Ceramic Flooring, Electrical, Mechanical, Washroom Accessories, HVAC & Plumbing, Painting, Security System ect.
LOCATION: 1699 Dundas St E, Mississauga, ON L4X 1L5
Project Overview
Comprehensive Overhaul
- Meticulous demolition of floor, wall tiles, ceiling, toilets, partition, and concrete slab.
- Creation of a new barrier-free washroom.
General Contractor Priorities
- Seamless coordination with the owner and other trades.
- Minimization of disruptions and upholding life safety systems.
Collaborative Teamwork
- Emphasis on collaborative teamwork for an integrated approach to challenges.
- Achievement of defined objectives through effective collaboration.
Impact Our Project Brings
Quality Control and Compliance
- Unwavering commitment to quality control and compliance with building codes.
- Adherence to stringent standards throughout the project.
Plumbing Overhaul
- Replacement of all existing toilets and sinks with new plumbing fixtures.
- Installation of new connections and rough-ins.
HVAC and Sprinkler Systems
- Implementation of a new HVAC system for improved comfort.
- Integration of a new sprinkler system for enhanced safety.
- Fixture Upgrades
- Installation of hard-wire style flush valves for toilets and urinals.
- Carpentry and Millwork: Crafting and installation of new carpentry and millwork for countertops with mirrors.
Occupied Building Challenges
- Implementation of measures to maintain a tranquil environment during concurrent programs.
- Strategic placement of dust barriers and use of specialized vacuuming machines.
- Electrical Enhancements
- Installation of new electric fixtures, switches, and emergency lighting.
Dust Mitigation Strategy
- Mitigation of dust spread with precise measures.
- Upholding a standard of precision in every dimension of the project.