ST. JEROMES – C. S. WASHROOM UPGRADE

Introducing St. Jerome School Project
After the successful completion of another transformative project by Adeli Construction, we are excited to present our finalized project execution for the Transformation of the school services and facilities areas at St. Jerome Catholic Elementary School. During this challenging project we dealt with an occupied building, with construction materials that were implemented with the abolished standards of the past, an existing HVAC system that should be tested and commissioned after all job finished in order to leave it safe for the occupants. With a steadfast commitment to quality, safety, and efficiency, Adeli Construction already has delivered remarkable results, ensuring a monumental upgrade for St. Jerome Catholic Elementary School.
- Total Occupants: 600 Students
- Type: Institutional
- Time frame: 3 months
- Divisions: Terrazzo - Flooring, Electrical, Mechanical, Washroom Accessories, Plumbing
LOCATION: 111 Sharpcroft Blvd, North York, ON M3J 3E9
Project Overview
Comprehensive Upgrade Scope
- Provision and Installation: Modern plumbing fixtures are at the heart of our upgrade, ensuring a contemporary and functional washroom environment.
- Inclusive Coverage: From labor to materials, equipment, tools, and supervision, our comprehensive approach aligns seamlessly with provided drawings.
- Meticulous Removal: We undertake the careful removal and proper disposal of existing equipment, prioritizing the repair of any damage to ceilings, walls, and existing systems.
General Contractor Commitment
- Prioritization of Coordination: As your General Contractor, we prioritize construction coordination, collaborating seamlessly with the school and other trades to minimize disruptions.
- Stringent Quality Control: Adhering to the Ontario Building Code, Ontario Electrical Safety Code, and other standards, our commitment to quality is unwavering.
- Emphasis on Aesthetics: We focus on high-quality materials and workmanship, ensuring a clean and aesthetically pleasing appearance in the renovated facilities.
Efficiency and Collaboration
- Commitment to Timeliness: Our dedication to efficiency is reflected in strict schedule control and monitoring, guaranteeing a timely project completion.
- Proactive Approach: We tackle challenges proactively, promoting an integrated team approach to address issues collaboratively.
- Thorough Inspections: Regular inspections, conducted with precision during and after school hours, ensure a clean and safe environment.
Impact our Project Brings
Tailored Facility for the School Community
Our upgraded washroom facility is purposefully designed for the unique needs of the school community. We prioritize safety, comfort, and a modern environment for students and staff. The result is an immediate and lasting enhancement of the overall learning experience.
Beyond Construction
Our project goes beyond construction, bringing tangible benefits to St. Jerome Catholic Elementary School. We are dedicated to long-term success, ensuring our impact is woven into the fabric of the school’s future. Understanding the importance of our work, we contribute to the continued success of the school.
Long-Term Positive Outcomes
The upgraded washroom facility assures a lasting positive impact on the school community. Our commitment extends to leaving a legacy of enhanced safety, comfort, and modern amenities for future generations. Recognizing that our work goes beyond project completion, it delivers ongoing benefits for the school and its stakeholders.
Related Projects
Paramount Center, International Soccer Club
In Progress, Projects
Guelph Hospital
Commercials, Projects
SMPK Church and Institution
In Progress, Projects